How Much Does a Small Bathroom Remodel Cost in Chicago?

If you have a small bathroom (8’x5’, 10’x5’, or 6’x6’) with a toilet, vanity, and tub or shower—and you’re wondering how much it costs to remodel it without relocating plumbing—this guide is for you.
In Chicago and surrounding suburbs, a small Pull and Replace Bathroom Remodel with three plumbing fixtures typically starts at $30,000+. This option gives you a completely updated bathroom without changing the existing floor plan.
What Is a Pull-and-Replace Bathroom Remodel?
A pull-and-replace remodel keeps the existing layout and replaces all fixtures and finishes with new materials. No plumbing relocation, no walls moved, and no structural changes.
This remodeling approach typically includes:
New vanity, toilet, and bathtub or shower
New tile, flooring, lighting, mirrors, and paint
Plumbing fixtures remain in the same location
New drywall and insulation where needed
Professional design and project management
Three-year labor warranty
Cost Breakdown: $30,000+
This price includes labor, building materials, project management, and $8,000+ in material allowances, which typically cover:
Up to 30” vanity cabinet or pedestal sink
Quartz countertop (up to 8 sq ft remnant)
Delta chrome sink and shower faucet sets
Toilet
Bathtub or custom shower drain system
Exhaust fan (Panasonic or Broan-NuTone)
Up to 140 sq ft ceramic or porcelain floor tile
Standard bathroom accessories such as towel bar and paper holder
What’s Included in the Pull-and-Replace Package?
1. Management and Design
Weekly design and construction updates
Buildertrend App for selections, communication, billing, and schedule tracking
Interior design with plans, elevations, 3D renderings, and up to two revisions
Dedicated project manager and master installers
Three-year labor warranty
2. Demolition and Preparation
Floor and dust protection using plastic and tarps
Removal of vanity, light fixtures, tile, toilet, mirrors, and drywall as needed
Subfloor and drywall remain unless damaged
If lath and plaster or structural issues are found, additional pricing will be provided before continuing
3. Framing and Plumbing
Custom 36” x 60” low-curb shower base or tub framing with niche (up to 24”x18”)
Plumbing stays in the same location
Installation of rough-in valves, faucets, toilet, p-traps, drains, waterproofing membrane
4. Electrical and Ventilation
New GFCI outlet and light switches
One recessed can light and one vanity mirror light
Exhaust fan and venting to exterior
All electrical connected to existing circuits
5. Drywall, Insulation, and Tile
Moisture-resistant drywall and insulation where exposed during demolition
Tile installed up to 84” high on shower walls
Mosaic shower floor or tile tub surround
12”x12” or larger bathroom floor tile
6. Carpentry, Painting, and Final Touches
New baseboards, door casing, and door stops
Vanity or pedestal sink installation
Painting of walls, ceiling, doors, and trim (two coats Sherwin Williams ProMar 200)
Final cleanup and accessory installation
Project Duration
Estimated timeline: approximately four weeks
May vary based on permitting, inspections, material delays, customer selection choices, or change orders
Bathroom cannot be used during construction
Why Homeowners Choose This Option
Lower cost than full gut or layout redesign
Shorter timeline (about four weeks)
Increases home value and appeal to buyers
Clean, modern upgrade without relocating plumbing
Ideal for rentals, guest bathrooms, resale prep, or outdated primary bathrooms
Ready to Start Your Bathroom Remodel?
4Ever Remodeling specializes in high-quality, stress-free pull-and-replace bathroom renovations. Pricing, design, and schedules are clearly defined before construction begins.
Schedule your in-home consultation.