BATHROOM REMODELING Pricing
Real Prices for Real Bathroom Remodels.
Whether you’re refreshing an outdated guest bath or building the primary suite you’ve always wanted, we give you a clear scope and honest pricing before any tile gets pulled. No vague estimates, no surprises at the finish line. All pricing includes proposed finishes selected by our in-house team, plus our full suite of services: personalized. 3D renderings, a dedicated architectural designer and project manager, master installers, BuilderTrend app access, weekly updates, office support, and a 3-year labor warranty.
3-Plumbing-Fixture Bathroom Remodel (Small)
Custom
$60K+
Estimated timeline: 5-7 weeks.
Fully customized primary-style bath
Full demolition + lath & plaster
Custom low-curb shower base
Plumbing relocation
New electrical + recessed lighting + heated floor
New insulation + drywall
Porcelain, ceramic, glass, or stone tile
Double vanity with drawers
Full painting
Signature
$50K+
Estimated timeline: 3-5 weeks.
Full renovation
Full demolition + lath & plaster
Custom low-curb shower base
Plumbing stays in place
New electrical + recessed lighting
New insulation + drywall
Porcelain or ceramic tile
Single vanity or pedestal sink
Full painting
Pull & Replace
$30K+
Estimated timeline: 3-4 weeks.
Simple refresh, same layout
Demolition as needed
Custom low-curb shower base
Plumbing stays in place
New electrical + recessed lighting
Insulation + drywall where exposed
Porcelain or ceramic tile
Single vanity or pedestal sink
Full painting
4-Plumbing-Fixture Bathroom Remodel (Mid-Size)
Custom
$80K+
Estimated timeline: 7-9 weeks.
Primary bathroom upgrades
Full demolition + layout redesign
Plumbing relocation
Walk-in shower or tub
Double vanity
Heated floors
Custom tile + glass
Premium finishes
New lighting + exhaust fan
Full painting
Signature
$65K+
Estimated timeline: 6-8 weeks.
Full renovation
Full demolition to studs
Plumbing in same location
Waterproofed shower system
Tile (floor + walls)
Double vanity
New lighting + exhaust fan
Full painting
Pull & Replace
$50K+
Estimated timeline: 5-6 weeks.
Cosmetic update
Selective demolition
Plumbing remains in place
Shower/tub refresh
Tile updates (floor + walls)
Vanity + fixtures
New lighting + exhaust fan
Full painting
5-Plumbing-Fixture Bathroom Remodel (Large)
Custom
$100K+
Estimated timeline: 7-9 weeks.
Fully custom primary suite
Full demolition + reconfiguration
Plumbing relocation
Walk-in shower + tub
Double vanity
Heated floors
Custom tile + glass
Premium fixtures
New lighting + exhaust fan
Full painting
Signature
$75K+
Estimated timeline: 7-9 weeks.
Full renovation
Full demolition to studs
Plumbing in same location
Waterproofing system
Tile (floor + walls)
Double vanity
New lighting + exhaust fan
Full painting
Pull & Replace
$50K+
Estimated timeline: 5-7 weeks.
Basic refresh
Selective demolition
Plumbing remains in place
Shower/tub refresh
Tile updates (floor + walls)
Vanity + fixtures
New lighting + exhaust fan
Full painting
This price guide is for informational purposes only and does not constitute a contractual agreement. Final pricing will be provided by your architectural designer. Pricing is based on typical project assumptions, including standard room sizes, layouts, and baseline quantities of materials, fixtures, and finishes; variations in size, selections, quantities, and overall scope will impact final cost. Exclusions include appliances, decorative lighting, permit and architect fees, structural changes (unless specified), code corrections, mold or asbestos remediation, moving personal belongings, and relocation or modification of existing plumbing, electrical, or HVAC systems. Any unforeseen conditions requiring repair or adjustment will be addressed with additional pricing as needed. Allowances and finishes are estimates, and all project pricing will vary based on the unique scope and selections.