BASEMENT FINISHING Pricing

Know What You're Getting Before We Break Ground.

A finished basement adds real living space and real value to your home, and it starts with a clear plan and honest numbers. Here’s what each level of finish includes and what it costs.

500-700 SF Basement Remodel - Includes New Bath

Custom

$105K+

Estimated timeline: 10-13 weeks.                                      Fully finished basement with new bath and laundry room

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with laundry room + custom shower with niche

Plumbing can be relocated to fit new layout

Ejector pump + bathroom fixtures + laundry connections included

New electrical

New insulation + drywall

Tile shower walls + mosaic shower floor + tiled bathroom floor

LVT flooring + upgraded red oak staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$95K+

Estimated timeline: 10-13 weeks.
Finished basement with new bath, existing laundry plumbing retained

Demolition as needed

Updated layout with bathroom + custom shower base

Plumbing stays in existing locations (no relocation)

Ejector pump + bathroom fixtures + shower waterproofing included

New electrical

New insulation + drywall

Tile shower walls + mosaic shower floor + tiled bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

Pull & Replace

$90K+

Estimated timeline: 10-13 weeks.
Finished basement with new small bath, no laundry room

Demolition as needed

Layout improvements within existing footprint (small bathroom)

Plumbing stays in existing locations (no relocation)

Ejector pump + standard shower or tub + waterproofing included

New electrical

New insulation + drywall

Tile shower walls + LVT bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

500-700 SF Basement Remodel - No Bath Included

Custom

$70K+

Estimated timeline: 8-11 weeks.
Finished basement with new laundry room, no bath

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with laundry room

Plumbing can be relocated to fit new layout

Laundry connections included

New electrical throughout

New insulation + drywall

LVT flooring + white primed staircase railing

Interior doors + laundry room cabinets + trim

Full painting

Signature

$65K+

Estimated timeline: 7-8 weeks.
Finished basement, no bath or laundry room

Demolition as needed

Updated layout with storage or office

Plumbing remains in existing locations (no relocation)

No new plumbing work

Updated electrical

New insulation + drywall

LVT flooring + standard white primed staircase railing

Interior doors + trim

Full painting

700-1000 SF Basement Remodel - Includes New Bath

Custom

$110K+

Estimated timeline: 10-13 weeks.
Fully finished basement with new bath, office and laundry room

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with office, laundry room + custom shower

Plumbing can be relocated to fit new layout

New bathroom + laundry connections included

New electrical throughout

New insulation + drywall

Tile shower walls + detailed shower floor + tiled bathroom floor

LVT flooring + upgraded red oak staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$100K+

Estimated timeline: 8-11 weeks.
Finished basement with new bath, existing laundry plumbing retained

Demolition as needed

Updated layout with bathroom + custom shower base

Plumbing stays in existing locations (no relocation)

Ejector pump + bathroom fixtures + shower waterproofing included

Updated electrical

New insulation + drywall

Tile shower walls + detailed shower floor + tiled bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

Good

$95K+

Estimated timeline: 8-10 weeks.
Finished basement with new small bath, no laundry room

Demolition as needed

Layout improvements within existing footprint (small bathroom)

Plumbing stays in existing locations (no relocation)

Standard shower or tub + waterproofing included

Updated electrical

New insulation + drywall

Tile shower walls + LVT bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

700-1000 SF Basement Remodel - No Bath Included

Custom

$75K+

Estimated timeline: 7-10 weeks.
Finished basement with new laundry room, no bath

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with office + storage

Plumbing can be relocated to fit new layout

Laundry connections included

New electrical throughout

New insulation + drywall

LVT flooring + white primed staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$70K+

Estimated timeline: 7-8 weeks.
Finished basement, no bath or laundry room

Demolition as needed

Updated layout with storage

Plumbing remains in existing locations (no relocation)

No new plumbing work

Updated electrical

New insulation + drywall

LVT flooring + standard white primed staircase railing

Interior doors + trim

Full painting

1000-1500 SF Basement Finishing - Includes New Bath

Custom

$130K+

Estimated timeline: 12-15 weeks.
Fully finished basement with new bath and laundry room

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with multiple rooms + custom shower

Plumbing can be relocated to fit new layout

New bathroom + laundry connections included

New electrical throughout

New insulation + drywall

Tile shower walls + detailed shower floor + tiled bathroom floor

LVT flooring + upgraded red oak staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$120K+

Estimated timeline: 12-15 weeks.
Finished basement with new bath, existing laundry plumbing retained

Demolition as needed

Updated layout with additional room + custom shower base

Plumbing remains in existing locations

New bathroom fixtures + laundry connections included

Updated electrical

New insulation + drywall

Tile shower walls + detailed shower floor + tiled bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

Good

$115K+

Estimated timeline: 10-12 weeks.
Finished basement with new small bath, no laundry room

Demolition as needed

Layout improvements within existing footprint with small bathroom

Plumbing remains in existing locations

Standard shower or tub + waterproofing included

Updated electrical

New insulation + drywall

Tile shower walls + LVT bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

1000-1500 SF Basement Finishing - No Bath Included

Custom

$95K+

Estimated timeline: 10-13 weeks.
Finished basement with new laundry room, no bath

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with laundry room + storage

Plumbing can be relocated to fit new layout

Laundry connections included

New electrical throughout

New insulation + drywall

LVT flooring + white primed staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$90K+

Estimated timeline: 8-10 weeks.
Finished basement, no bath or laundry

Demolition as needed

Updated layout with storage

Plumbing remains in existing locations

No new plumbing work

Updated electrical

New insulation + drywall

LVT flooring + white primed staircase railing

Interior doors + trim

Full painting

1500-2000 SF Basement Finishing - Includes New Bath

Custom

$160K+

Estimated timeline: 14-17 weeks.
Fully finished basement with new bath and laundry room

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with multiple rooms + custom shower

Plumbing can be relocated to fit new layout

New bathroom + laundry connections included

New electrical throughout

New insulation + drywall

Tile shower walls + detailed shower floor + tiled bathroom floor

LVT flooring + upgraded red oak staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$150K+

Estimated timeline: 14-17 weeks.
Finished basement with new bath, existing laundry plumbing retained

Demolition as needed

Updated layout with multiple rooms + custom shower base

Plumbing remains in existing locations

New bathroom fixtures + laundry connections included

Updated electrical

New insulation + drywall

Tile shower walls + detailed shower floor + tiled bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

Good

$145K+

Estimated timeline: 12-14 weeks.
Finished basement with new small bath, no laundry room

Demolition as needed

Layout improvements within existing footprint (small bathroom)

Plumbing remains in existing locations

Standard shower or tub + waterproofing included

Updated electrical

New insulation + drywall

Tile shower walls + LVT bathroom floor

LVT flooring + standard white primed staircase railing

Cabinets, interior doors + trim

Full painting

1500-2000 SF Basement Finishing - No Bath Included

Custom

$120K+

Estimated timeline: 12-15 weeks.
Fully finished basement with new laundry room, no bath

Full demolition down to framing (walls + ceiling)

Fully redesigned layout with room + storage

Plumbing can be relocated to fit new layout

Laundry connections included

New electrical throughout

New insulation + drywall

LVT flooring + white primed staircase railing

Cabinets, interior doors + trim

Full painting

Signature

$115K+

Estimated timeline: 12-14 weeks.
Finished basement, no bath or laundry

Demolition as needed

Updated layout with storage

Plumbing remains in existing locations

No new plumbing work

Updated electrical

New insulation + drywall

LVT flooring + white primed staircase railing

Interior doors + trim

Full painting

This price guide is for informational purposes only and does not constitute a contractual agreement. Final pricing will be provided by your architectural designer. Pricing is based on typical project assumptions, including standard room sizes, layouts, and baseline quantities of materials, fixtures, and finishes; variations in size, selections, quantities, and overall scope will impact final cost. Exclusions include appliances, decorative lighting, permit and architect fees, structural changes (unless specified), code corrections, mold or asbestos remediation, moving personal belongings, and relocation or modification of existing plumbing, electrical, or HVAC systems. Any unforeseen conditions requiring repair or adjustment will be addressed with additional pricing as needed. Allowances and finishes are estimates, and all project pricing will vary based on the unique scope and selections.